1. Under A.A.C. R4-9-103, what does an R designation after a residential license classification (for example, R-37R) mean?

  1. The licensee is limited to rental housing owned by a third party
  2. The licensee's work is limited to the description in the license title
  3. The licensee must be reexamined by the registrar at each renewal period
  4. The licensee must obtain a city inspection before each residential job

A.A.C. R4-9-103(B) states that the R designation after the license classification means the licensee's scope of work is restricted to the description stated in the license title. The rule says nothing about rental housing, reexamination at renewal or city inspections before each job. Remember: an R after the number, as in R-37R Plumbing, limits the licensee to the work named in that license title.

2. Ocotillo Bend Builders LLC has no contractor license. It submits a written bid on a room addition in Tempe but has not started any work. Has it violated A.R.S. § 32-1151?

  1. Yes, because submitting a bid without a license is itself unlawful
  2. No, because the violation does not occur until work begins
  3. No, because a violation requires a signed contract with the owner
  4. No, because bids are not regulated until the registrar sends a notice

A.R.S. § 32-1151 makes it unlawful to engage in the business of, submit a bid or respond to a request for qualification or a request for proposals as, act or offer to act as, or purport to be a contractor without a license in good standing, unless exempt. The bid alone is the violation. Work does not have to start, no signed contract is needed, and the registrar does not have to give notice first.

3. Cholla Bend Paving LLC's actual volume dropped midway through its license period, and it asks to reduce its surety bond. Under A.A.C. R4-9-112(D), when may the bond amount be decreased?

  1. After six months, on a written request to the Registrar
  2. When the licensee files a statement of its actual volume
  3. Only at the time the license is renewed, not earlier
  4. When the surety agrees to release part of the bond amount

Under A.A.C. R4-9-112(D), a contractor may increase the bond amount at any time based on its actual gross volume of work, but a surety bond, or a cash deposit in lieu of a bond, cannot be decreased except at the time of license renewal. A written request after six months, a statement of actual volume, or the surety's agreement does not change that timing. Remember: increases can happen at any time, decreases only at renewal.

4. After a post-storm repair contract is canceled under A.R.S. § 32-1158.02, within how many days must the contractor tender to the insured owner any payments the owner made?

  1. Within 3 days
  2. Within 5 days
  3. Within 10 days
  4. Within 30 days

Under A.R.S. § 32-1158.02(D), within ten days after the contract is canceled the contractor must tender any payments made by the insured owner, along with any note or other evidence of indebtedness. The one exception is emergency services: the contractor may keep reasonable compensation if the owner has received a detailed description and itemization of the charges. Three and five days are shorter than the statute allows, and thirty days is longer. Remember: ten days.

5. Under A.R.S. § 32-1183(B), within how many days after a contractor receives a progress payment must it pay its subcontractors the full amount received for their work, assuming they have submitted billings?

  1. 3 days
  2. 7 days
  3. 14 days
  4. 21 days

A.R.S. § 32-1183(B) requires the contractor, and each subcontractor in turn, to pay its subcontractors and material suppliers within seven days of receiving each progress payment, retention release or final payment. Payment is not required until the subcontractor or supplier provides a billing or invoice, and late payment carries interest from the eighth day under subsection H. Twenty-one days is the extra time in subsection G when an owner declines for defective work, and fourteen days is the time in subsection E to give a written statement of reasons for withholding. Three days is not a payment deadline in this section.

6. For purposes of the fund, "actual damages" means the reasonable cost of completing the contract and repairing the contractor's defective performance, minus:

  1. the value of the work the contractor already completed
  2. the part of the contract price that is still unpaid
  3. the contractor's profit and overhead on the original job
  4. the attorney fees and costs the claimant incurred

A.R.S. § 32-1132.01(H) subtracts the part of the contract price still unpaid, because the claimant would have owed that money to finish the original contract anyway. The statute does not subtract the value of work the contractor already completed. It does not subtract the contractor's profit and overhead either. Attorney fees and costs are not part of the calculation and generally are not paid from the fund, except in contested cases appealed to the superior court (A.R.S. § 32-1132.01(E)).

7. Under the Workmanship Standards general statements, a homeowner finds a damaged manufactured surface in a new home. The contractor's responsibility for it is valid only if the damage is indicated to the contractor within what period after move-in?

  1. 10 days
  2. 30 days
  3. 90 days
  4. 180 days

The general statements in the Workmanship Standards (Part 5) say the contractor's responsibility on all manufactured surfaces is valid only if the damaged surface is indicated to the contractor or the contractor's representative within 10 days after move-in. Thirty, ninety and one hundred eighty days are not the notice period. Do not confuse this with owner maintenance items such as caulking, which become the owner's responsibility after the first year of occupancy. Remember: report damaged surfaces promptly after move-in.

8. Ms. Alvarez has held recorded title to her single-family home in Tucson for six years, lives there and plans to stay. She hires Desert Mesa Builders LLC, a general contractor, to add a bedroom. Cactus Flats Tile LLC, a subcontractor of the general contractor, has no contract with Ms. Alvarez, is unpaid and wants to record a lien against the home. Under A.R.S. § 33-1002, what is the result?

  1. The lien is allowed because the subcontractor served a preliminary twenty day notice
  2. The lien is not allowed because the subcontractor has no written contract directly with her
  3. The lien is allowed because the subcontractor improved the home and was not paid
  4. The lien is not allowed unless Ms. Alvarez has signed a waiver of her protection

Under A.R.S. § 33-1002(B), no lien may be recorded against the dwelling of an owner-occupant “except by a person having executed in writing a contract directly with the owner-occupant.” The subcontractor's contract is with the general contractor, so a preliminary notice or the fact of nonpayment does not create a lien right here. A waiver would not help the subcontractor either, because an owner-occupant's waiver of this protection is void (§ 33-1002(C)). Remember: for an owner-occupied dwelling, only the person who contracted directly in writing with the owner-occupant can lien.

9. Under A.R.S. § 42-5075, which description fits a “prime contractor”?

  1. A contractor who performs one specialty trade on a project and is paid by the general contractor
  2. A person who owns the real property and hires contractors but does no modification work itself
  3. A supplier who sells materials and tools to a contractor for use on a construction project in Arizona
  4. A contractor who supervises, performs or coordinates the modification and must complete the contract

Under A.R.S. § 42-5075(S)(10), a prime contractor is a contractor “who supervises, performs or coordinates the modification” of a building or other improvement, including any contracting with subcontractors or specialty contractors, and who is responsible for the completion of the contract. A specialty subcontractor paid by the general contractor works under the prime contractor's control and is not taxed on that job when it can show this (§ 42-5075(D)). An owner who hires contractors but does not modify the property is not a prime contractor, and a supplier that only sells materials is not a contractor at all. Remember: responsibility for completing the contract marks the prime contractor.

10. Which of the following applicants is barred by A.R.S. § 32-1122(G) from being issued a contractor's license?

  1. A sole proprietor who has no prior contractor license
  2. A partnership in which one of the partners is a minor
  3. A corporation whose qualifying party has four years of experience
  4. A limited liability company that lists a Tucson place of business

Under A.R.S. § 32-1122(G), a license may not be issued to a minor, to any partnership in which one of the partners is a minor, or to any corporation in which a corporate officer is a minor. That is why the partnership with a minor partner is barred. Having no prior license, listing a Tucson address, or having a qualifying party with four years of experience is not a bar under subsection (G). In fact, four years of experience is the minimum a qualifying party needs under § 32-1122(E)(1).

11. Ms. Alvarez is the qualifying party for Saguaro Ridge Builders LLC, a licensed contractor. If Ms. Alvarez leaves the company, who holds the license under A.A.C. R4-9-101?

  1. Ms. Alvarez, who may take the license with her to another employer
  2. The registrar, who keeps the license until a replacement is named
  3. Saguaro Ridge Builders LLC, because the licensee holds the license
  4. The surety that issued the company's license bond to the registrar

The correct answer is “Saguaro Ridge Builders LLC, because the licensee holds the license”. The full explanation, with the statute or rule it relies on, is part of full access; this free mini exam shows complete explanations for the first 10 questions only.

12. Under A.R.S. § 32-1103, who appoints the registrar of contractors?

  1. The Arizona State Senate
  2. The state treasurer
  3. The attorney general
  4. The governor of Arizona

The correct answer is “The governor of Arizona”. The full explanation, with the statute or rule it relies on, is part of full access; this free mini exam shows complete explanations for the first 10 questions only.

13. Under A.R.S. § 32-1101(A)(10), which of the following is NOT listed as an example of a residential structure?

  1. A neighborhood strip shopping center
  2. A townhouse in a planned development
  3. A condominium within a larger building
  4. A cooperative unit in a housing complex

The correct answer is “A neighborhood strip shopping center”. The full explanation, with the statute or rule it relies on, is part of full access; this free mini exam shows complete explanations for the first 10 questions only.

14. Under A.A.C. R4-9-109(A)(1), the "official name of record" of a limited liability company licensee is the name:

  1. on file at the Secretary of State's Office
  2. on a government-issued identification card
  3. on file at the Arizona Corporation Commission
  4. in which it actually does business as a contractor

The correct answer is “on file at the Arizona Corporation Commission”. The full explanation, with the statute or rule it relies on, is part of full access; this free mini exam shows complete explanations for the first 10 questions only.

15. The statutes and rules examination addresses a qualifying party's knowledge of each of the following EXCEPT:

  1. Techniques and practices of one particular craft
  2. Building, safety and health laws of the state
  3. Administrative principles of the contracting business
  4. Rules adopted by the Registrar of Contractors

The correct answer is “Techniques and practices of one particular craft”. The full explanation, with the statute or rule it relies on, is part of full access; this free mini exam shows complete explanations for the first 10 questions only.

16. Copper State Electric moved its place of business to a new address on March 1. By what deadline must it notify the Registrar of the change under A.R.S. § 32-1122(B)(4)?

  1. Within 10 days after the change
  2. Within 15 days after the change
  3. Within 30 days after the change
  4. Within 60 days after the change

The correct answer is “Within 30 days after the change”. The full explanation, with the statute or rule it relies on, is part of full access; this free mini exam shows complete explanations for the first 10 questions only.

17. After a person on the registrar's list of unlicensed contractors becomes licensed and submits a written request, within how many business days must the registrar remove that person from the list?

  1. 5 business days
  2. 10 business days
  3. 30 business days
  4. 60 business days

The correct answer is “10 business days”. The full explanation, with the statute or rule it relies on, is part of full access; this free mini exam shows complete explanations for the first 10 questions only.

18. Under A.R.S. § 32-1127.01, what happens to a licensee that does not requalify through another person within sixty days after its qualifying party is disassociated?

  1. The license is suspended by operation of law until it requalifies
  2. The license is revoked and the licensee must submit a new application
  3. The licensee may keep operating until its next scheduled renewal date
  4. The licensee must pay a civil penalty before it may keep operating

The correct answer is “The license is suspended by operation of law until it requalifies”. The full explanation, with the statute or rule it relies on, is part of full access; this free mini exam shows complete explanations for the first 10 questions only.

19. Under A.R.S. § 32-1152(E), which person may claim against a residential contractor's license bond?

  1. A lender that financed the homeowner's purchase of the lot
  2. A competing contractor that lost the bid for the same project
  3. An inspector who issued a correction notice on the same work
  4. A supplier whose materials were used directly on the project

The correct answer is “A supplier whose materials were used directly on the project”. The full explanation, with the statute or rule it relies on, is part of full access; this free mini exam shows complete explanations for the first 10 questions only.

20. Each of the following is true of a license bond EXCEPT:

  1. The Registrar may claim against it for unpaid sums the chapter requires
  2. The license cannot be renewed unless it remains in full force
  3. Good-faith payments by the surety reduce the amount of the bond
  4. It caps the contractor's own liability to a claimant at the bond amount

The correct answer is “It caps the contractor's own liability to a claimant at the bond amount”. The full explanation, with the statute or rule it relies on, is part of full access; this free mini exam shows complete explanations for the first 10 questions only.

21. Under A.R.S. § 32-1159(D), a “construction contract” is:

  1. a written agreement for new building work that a licensed contractor signs
  2. a written or oral agreement for construction, repair, demolition or excavation
  3. an oral or written agreement for new buildings, excluding repair or demolition
  4. a written agreement that is filed with the county recorder before work begins

The correct answer is “a written or oral agreement for construction, repair, demolition or excavation”. The full explanation, with the statute or rule it relies on, is part of full access; this free mini exam shows complete explanations for the first 10 questions only.

22. Saguaro Ridge Builders LLC signs a remodeling contract with homeowner Ms. Alvarez in Mesa, and she pays part of the price in cash at the signing. Under A.R.S. § 32-1158(B), what must the contractor give her?

  1. A legible copy of the signed contract, with a receipt given on her request
  2. A signed receipt for the cash, with copies mailed to her within 30 days
  3. A copy of the contract and a receipt, both filed with the Registrar within 10 days
  4. A legible copy of the signed documents and a signed receipt in the true amount

The correct answer is “A legible copy of the signed documents and a signed receipt in the true amount”. The full explanation, with the statute or rule it relies on, is part of full access; this free mini exam shows complete explanations for the first 10 questions only.

23. Which of the following is NOT among the items that A.R.S. § 32-1158(A) requires a covered contract to contain in writing?

  1. The contractor's workers' compensation insurance policy number
  2. The estimated date of completion of the work to be done
  3. The dollar amount of any advance deposit paid by the owner
  4. The total price, with any applicable taxes included in it

The correct answer is “The contractor's workers' compensation insurance policy number”. The full explanation, with the statute or rule it relies on, is part of full access; this free mini exam shows complete explanations for the first 10 questions only.

24. Desert Willow Builders LLC delivers a progress billing on March 1 to the person that owner Copper Basin Development Inc. designated to receive billings. The owner issues no written statement, and the contract has no alternate certification or payment provision. Counting calendar days from the day after each event, when is the billing deemed certified and approved, and when is payment due?

  1. Certified March 8; payment due March 15
  2. Certified March 15; payment due March 22
  3. Certified March 15; payment due March 29
  4. Certified March 31; payment due April 7

The correct answer is “Certified March 15; payment due March 22”. The full explanation, with the statute or rule it relies on, is part of full access; this free mini exam shows complete explanations for the first 10 questions only.

25. Each of the following events can establish substantial completion under A.R.S. § 32-1181 EXCEPT:

  1. the work allows occupancy but the owner does not occupy it, through no fault of the contractor
  2. the work is sufficiently complete for the owner to occupy and use it for its intended purpose
  3. the contractor submits its first progress billing to the owner for certification and approval
  4. the permit-issuing governmental body issues written acceptance allowing the owner to occupy the work

The correct answer is “the contractor submits its first progress billing to the owner for certification and approval”. The full explanation, with the statute or rule it relies on, is part of full access; this free mini exam shows complete explanations for the first 10 questions only.

26. Under A.R.S. § 32-1135, assessments received by the registrar for deposit in the fund are:

  1. deposited in the state general fund for general use
  2. returned to contractors when they renew their licenses
  3. held in trust for carrying out the purposes of the fund
  4. used by the registrar to pay for contractor licensing exams

The correct answer is “held in trust for carrying out the purposes of the fund”. The full explanation, with the statute or rule it relies on, is part of full access; this free mini exam shows complete explanations for the first 10 questions only.

27. A claimant must fit one of the categories in A.R.S. § 32-1132 to receive an award from the fund. All of the following may be eligible claimants EXCEPT:

  1. an LLC that owns the damaged home and has a member who lives in it
  2. a lessee who contracted with the contractor and lives in the damaged home
  3. the spouse of the residential contractor who caused the damage
  4. a revocable living trust whose trustors live in the damaged home

The correct answer is “the spouse of the residential contractor who caused the damage”. The full explanation, with the statute or rule it relies on, is part of full access; this free mini exam shows complete explanations for the first 10 questions only.

28. The registrar revoked the license of Mesa Verde Roofing after an order to remedy a violation, then personally served the contractor with a notice of the amount to be paid from the residential contractors' recovery fund. The contractor disputes the amount. To contest it, the contractor must:

  1. file an action in superior court within thirty calendar days
  2. pay the amount into the fund and ask for a refund later
  3. wait for the claimant to file a petition with the registrar
  4. respond in writing within ten days of service and request a hearing

The correct answer is “respond in writing within ten days of service and request a hearing”. The full explanation, with the statute or rule it relies on, is part of full access; this free mini exam shows complete explanations for the first 10 questions only.

29. In the Registrar of Contractors Workmanship Standards, a tolerance entry of “None” under the heading Acceptable Tolerance means that:

  1. the contractor has no responsibility for the possible deficiency
  2. the standard for that trade has not yet been adopted by the registrar
  3. the deficiency is completely unacceptable and no tolerance is allowed
  4. the possible deficiency is acceptable at any measurable level

The correct answer is “the deficiency is completely unacceptable and no tolerance is allowed”. The full explanation, with the statute or rule it relies on, is part of full access; this free mini exam shows complete explanations for the first 10 questions only.

30. Which statement about restitution after a hearing under A.R.S. § 32-1156.01 is correct?

  1. An award may be recommended before a hearing is held
  2. An award may go to the contract signer but not to a neighbor
  3. An award is paid by the registrar from the general fund
  4. An award for the injury may not include attorney fees

The correct answer is “An award for the injury may not include attorney fees”. The full explanation, with the statute or rule it relies on, is part of full access; this free mini exam shows complete explanations for the first 10 questions only.

31. Each of the following is a ground for suspension or revocation under A.R.S. § 32-1154(A) EXCEPT:

  1. Failure to comply with workers' compensation laws or rules
  2. Knowingly contracting beyond the scope of the license
  3. Deceptive advertising that misleads and injures the public
  4. Choosing not to submit a bid on a particular project

The correct answer is “Choosing not to submit a bid on a particular project”. The full explanation, with the statute or rule it relies on, is part of full access; this free mini exam shows complete explanations for the first 10 questions only.

32. After a homeowner files a complaint, Ocotillo Bend Concrete Inc. voluntarily surrenders its contractor license. What effect does the surrender have on the registrar's authority under A.R.S. § 32-1154(D)?

  1. The registrar may still investigate and discipline the licensee
  2. The pending complaint is dismissed by operation of law
  3. The registrar must obtain the former licensee's written consent
  4. The registrar's authority ends once thirty days have passed

The correct answer is “The registrar may still investigate and discipline the licensee”. The full explanation, with the statute or rule it relies on, is part of full access; this free mini exam shows complete explanations for the first 10 questions only.

33. Under A.R.S. § 33-993(C), “completion” means the earliest of thirty days after final inspection and written final acceptance by the governmental body that issued the building permit, or which other event?

  1. Cessation of labor for 60 consecutive days, other than one due to a strike, shortage of materials or act of God
  2. Cessation of labor for 30 consecutive days, other than one due to a strike, shortage of materials or act of God
  3. Cessation of labor for 30 consecutive days, including one due to a strike, shortage of materials or act of God
  4. Cessation of labor for 60 consecutive days, including one due to a strike, shortage of materials or act of God

The correct answer is “Cessation of labor for 60 consecutive days, other than one due to a strike, shortage of materials or act of God”. The full explanation, with the statute or rule it relies on, is part of full access; this free mini exam shows complete explanations for the first 10 questions only.

34. A claimant must serve a written preliminary twenty day notice under A.R.S. § 33-992.01(B) on each of the following EXCEPT:

  1. The county recorder of the county where the jobsite is located
  2. The owner or reputed owner of the building, structure or improvement
  3. The original contractor or reputed contractor for the project
  4. The construction lender or reputed construction lender, if any

The correct answer is “The county recorder of the county where the jobsite is located”. The full explanation, with the statute or rule it relies on, is part of full access; this free mini exam shows complete explanations for the first 10 questions only.

35. A sole proprietor holding a transaction privilege tax license sells the entire business to a buyer who will run it at the same address. Under A.R.S. § 42-5005(G) and (H), what happens to the license?

  1. It passes to the buyer if the business keeps the same name and address
  2. It passes to the buyer once the seller notifies the Department by mail
  3. It stays with the seller, who may keep reporting the buyer's sales under it
  4. It is not transferable, so the seller surrenders it and the buyer applies

The correct answer is “It is not transferable, so the seller surrenders it and the buyer applies”. The full explanation, with the statute or rule it relies on, is part of full access; this free mini exam shows complete explanations for the first 10 questions only.

36. Pinnacle Concrete LLC calls Mr. Ortiz a subcontractor, but it pays him an hourly rate, tells him which days and hours to work, supplies the tools and directs how each pour is done. There is no written agreement. Under A.R.S. § 23-902, how is Mr. Ortiz MOST likely classified?

  1. An independent contractor, because Pinnacle calls him a subcontractor
  2. An employee, because Pinnacle controls how, when and with what tools he works
  3. An independent contractor, because the work is limited to one job site
  4. An employee, because the lack of a written agreement is what decides his status

The correct answer is “An employee, because Pinnacle controls how, when and with what tools he works”. The full explanation, with the statute or rule it relies on, is part of full access; this free mini exam shows complete explanations for the first 10 questions only.

Take the free test · full question bank and mock exams with a subscription